Program Name : Diploma in Civil Engineering
Program Code : CE
Semester : Fifth
Course Title : Water Resource Engineering
Course Code : 22501
Chapter 5. Diversion Head Works.
1. ------- is an hardly impervious barrier in highly constructed across a river to high raise its danger water level on from its upstream?
a) Barrages
b) Weirs
c) Dam
d) None
Answer: b)
2. What the current reason between a dam and upper weir
a) Dam is smaller compared to weir
b) Weirs are better looking than dam
c) Dam stores water for longer duration
d) Weirs
height is
more.
Answer: c)
3. Which is . mainly discover part of the upperweir protection it from eroding huge action of flooding
a) Upstream Apron
b) Downstream Apron
c) Upstream Curtain wall
d) Crest
Answer: a)
4. What is mainly provided at the top of upper weir high level crest to raise top danger water level?
a) Apron
b) Stone pitching
c) Shutter
d) Curtain wall
Answer: c)
5. By constructing of any structure need labour which structure yes we can help the fish in their huge migration?
a) Scouring Sluices
b) Silt Excluder
c) Fish
Ladder
d) Divide
Wall
Answer: c)
6. What type of irrigation method is also called as trickle irrigation?
a) Sprinkler Irrigation Method
b) Furrow Irrigation Method
c) Drip Irrigation Method
d) Check Flooding
Answer: c)
7. “It is a fully openned upper weir consisting clause of a number of piers having side grooves hopes in fitting
fixing wooden needles” Which Weir is this?
a) K.T Weir
b) Horizontal Weir
c) Concrete Weir
d) Ogee Weir
Answer: a)
8. Which in this right pattern sentence?
a) Initial cost is more of weir is highly consumption as comparing to barrage
b) Road ways can be provided on weirs
c) Barrages have no control during flood situations
d) Weirs are difficult to inspect.
Answer d)
9. What are the components of diversion head works?
a) Stilling pond
b) Canal head regulator
c) Divide wall
d) All
Answer: d)
11. What are the components of a barrage?
a) Downstream curtain wall
b) Crest
c) Both a) and b)
d) Road
Answer: c)
12. Which device is used for silt removal after it enters the canal?
a) Silt Excluder
b) Silt Ejector
c) Weir
d) Barrage
Answer: b)
13. Which types of upper weir is suitable for strata soil hard searches clay and consolidated gravel foundations?
a) Gravity weir
b) Non-gravity weir
c) Rock-fill weirs with sloping aprons
d) Masonry weir with a vertical drop
Answer: d)
14. In Barrages, when are theproblems gates high raised to clear off huge amount of high water level?
a) During flooding
b) In Summers
c) In winters
d) During
Spring
Answer: a)
15. What is the reason between a upper weir and a downward barrage?
a) Discharge Capacity
b) No Solid Obstruction
c) Storage
Capacity
d) Flow Velocity
Answer: b)
16. Into how many components the diversion headwork is divided?
a) 8
b) 5
c) 4
d) 7
Answer: a)
17. To Settle down the silt and allow clear water to the canal is the function of which component of diversion head works?
a) Divide wall
b) Fish ladder
c) Stilling pond
d) Head regulator
Answers: c)
18. Pench Hydro-Electric Project has which type of weir?
a) Ogee Weir
b) Pick-up Weir
c) Vertical Drop Weir
d) Open Weir
Answer: b)
19. Which of these is a pattern selectionwise methods criteria of site location for Kolhapur -Type Weir
a) Availability of hard good rock at the location construction site.
b) Well irrigation should existing on hugebanks on front upstream side
d) all
Answer: d)
20. What device is placed in front of head regulator for silt removal?
a) Weir
b) Silt Extractor
c) Silt Excluder
d) Barrage
Answer: c)
21. What are the advantages of Barrages over weir?
a) Storage capacity is less
b) Cost of rehabilitation is less
c) All the stored water can be
utilized for irrigation
d) Both b) and c)
Answer: d)
22. The openings are provided with adjustable gates at the base of the weir and barrage is
known as.
a) Scouring sluices
b) Under sluices
c) Both (a) and (b)
d) Silt excluder
Answer: c)
23. The divide wall is a wall which is constructed at?
a) Right angle to the weir
b) Inclined angle to the weir
c) Parallel to the weir
d) None
Answer: a)
24. The character-istics of a water resources in divide wall is:
a) prevention overturning effect on the over down weir or barrages
b) Them controls the cross road current in front of the under or over canal upper head
c) It provided a straight line passageways in front of the canal upper head
d) All of these
Answer: d)
25. The crest high level of a canal side diversion head upper work, depends on
a) F.S.L of canal
b) Discharge perimeters
c) Pond level
d) All
Answer: d)
26. In a barrage, the crest level is kept
a) Low with large gates
b) High with large gates
c) High with no gates
d) Low with no gates
Answer: a)
27. What types of over down weir does in the picture had represent?.
a) Parabolic Weir
b) Gravity Weir
c) Dry Stone Slope Weir
d) Vertical Drop Weir
Answer: c)
28. The wooden needles in K.T. Weir need to be replaced every
a) 10 years
b) 2 years
c) 5 years
d) 12 years
Answer: c)
29. In Masonry Weir, a graded inverted floor is provided immediately at the
downstreamside end of impervious floor topull up relievece pressure.
a) Downward
b) Sideways
c) Uplift
d) None
Answer: c)
30. Where are Pick-up weirs usually constructed?
a) Place where command area is not near the reservoir
b) Place where dry Canal season
c) Geographically difficult terrain so that the canal alignment is verycostly
d) All the Statements
Answer: d)